The first hanger for the airpark is going up quickly. As of the 15th December the roof trusses are being placed. The hanger is 50 ft x 180 ft so you can imaging the number of plywood sheets needed to roof it. I calculate over 300 depending on the overhang and roof pitch.
This view is south away from the taxiway. (click on image for large version)